Home
Background Reconstruction Role of LMKR Relief How can you help? Why Support Us Contact

 

Housing Costs

The average cost of a house is $10,000.

Plans have been drawn up for two, three and four bedroom houses of the following sizes:

10 x 5m plus 2m width veranda

• 

12m x 5m plus 2m width veranda

• 

14m x 5m plus 2m width veranda

• 

Machinery and equipment needed

Transport vehicles and construction equipment are required as follows:

6 x 4X4 Pickup trucks

• 

2 x Bobcats (Model 130B) or Caterpillar Skid Steer loaders (Model 226B) with buckets and drills

• 

6 x Generators (5KW)

• 

2 x Compressors (300 litre diesel)

•  4 x Cement mixers

•  4 x Nail guns (4")

• 

4 x Drop saws + 20 x spare blades

• 

4 x Chainsaws plus 16 spare chains

• 

6 x Power drills (770W cored)

•  2 x Skill saws plus 24 x spare blades

• 

1 x Grinders (9")

• 

2 x Heavy duty drop saws plus 100 blades

• 

6 x Sledge hammers

• 

20 x Wheelbarrows

• 

40 x Shovels

• 

30 x Picks

• 

40 x Heavy duty hand drills

   

              Back



Back to home
Gallery
Background   |  Reconstruction   |   Role of LMKR Relief    |  How you can help   |   Why support Us?    |  Contact
LMKR Website
©2010 LMKR
LMKR Hospital